Notices

  • Annual Shutdown and Christmas Best Wishes

    To our valued Stakeholders   You are being advised that the Regulatory Body will be on Annual Shutdown from Monday 20th December 2021 to 14 January 2022. During the shutdown there will be skeleton staff to man the reception and to deal with inquiries and collection of practicing certificates during...

    Read More...

  • World Engineering Day 2022 Program Announcement

    It's with great excitement that we announce the World Engineering Day 2022 Programme. Aligned with our theme for 2022: Build Back Wiser. Engineering The Future. Our 2022 programme is jam packed with new and interesting global events and we want YOU to be a part of it.    We are thrilled to announce the...

    Read More...

  • PUBLIC NOTICE : BOGUS / UNREGISTERED ENGINEERING PRACTITIONERS

      BOGUS / UNREGISTERED ENGINEERING PRACTITIONERS   The Engineering Council of Zimbabwe (ECZ) has lately observed that a number of unsuspecting clients and firms have engaged unregistered individual engineering practitioners and or Engineering Consulting Companies  to undertake varied  types of...

    Read More...

  • ALTERNATIVE ECZ CONTACT NUMBERS

    You are being advised that all ECZ Telephone lines are down at the moment.   While we are waiting for TelOne to have them fixed, you can contact us through Cell Phone Number : -                     +263-784 971 028  Any inconveniences caused is sincerely regretted. 

    Read More...

1% Project fee

EXPLANATORY NOTES: FEE ON CONSTRUCTION, ENGINEERING AND MINING PROJECTS

The 1% Project fee on consultancy and engineering fees for all construction, mining and engineering projects is a fee which the consultant collects from the project owner on behalf of the Council, or directly collected by Council itself.The fees for engineering work shall be paid by the project proponent. Every registered consultant engineer or technician shall invoice the client and remit to Council the collected fees within thirty (30) days of collection.

The 1% Project fee will be collected using the following consulting engineering fees schedules and payment stages in the By-laws.

 

1.1Stage One: Report

The fee for Stage One will be calculated on a time basis as set out in Paragraph A4 in the fees section, the 1% Project fee for this will be collected by Council thirty (30) days after invoicing by the consultant.

1.2Stage Two: Preliminary Design, Stage Three: Detailed Design, Tender Drawings and Documentation and Stage Four Working Drawings

The fees for Stages Two, Three and Four will be determined from table A6.1 in the fees section, the 1% Project fee for this will be collected by Council thirty (30) days after invoicing by the consultant.

1.3Stage Five: Contract Administration and Detail Drawings

The Project fee for Stage Five will be calculated as a percentage of the cost of the Works, or on a time basis if so agreed between the Client and the Consulting Engineer. The 1% Project fee for this will be collected by Council thirty (30) days after invoicing by the consultant.

If the project is a lump-sum based contract, the 1% of the Project fee shall be calculated and invoiced to the client by the consultant who shall be required to pay the fees to Council within thirty (30) days of collection.


Download The Registration Form Here.

Share

Search

Contacts

Contact Address:

Suite Y103 - Y106

National Sports Stadium,

Bays 24 - 27

Samora Machel Avenue,

Belvedere

P. O. Box 660

Harare

Contact Numbers

024-2222611 / 2227188 / 2222452

 Cell Number: 0784 971 028

 

Email:

This email address is being protected from spambots. You need JavaScript enabled to view it.

 

 

 

 

 

|WEBMAIL|

 

 

 

 

 

 

 

 

 

 

 

Our Banking Details

Account Name Engineering Council of Zimbabwe

Bank CBZ

Account Number 02322692650019

Branch Southerton

Swift Code COBZZWHA